- Equipment FIP
- December 26, 2025
- By admin_aqa
- Comments 0
3rd Party Inspection for FIP at Metallurgy labs in Thailand and Singapore
Drill Pipe, BHA Failures
- Pre-Production QA/QC
- December 26, 2025
- By admin_aqa
- Comments 0
UBD/MPD
Provide inspectors to Oil & Gas Operator for QA/QC Readiness before loadout to the rig for Under-balanced Drilling (UBD) and Managed Pressure Drilling (MPD)
- Pre-Production QA/QC
- December 26, 2025
- By admin_aqa
- Comments 0
OCTG
Provide auditor and inspectors to Oil & Gas Operator for pre-award audit and pre-manufacturing audit at various OCTG Mills in China
- Pre-Production QA/QC
- December 26, 2025
- By admin_aqa
- Comments 0
Wellhead
Provide auditor and inspectors to Oil & Gas Operator for pre-manufacturing, pre-delivery audit Wellhead Manufacturing Facility and Support Base in Thailand, Indonesia, and China
- QA/QC FOR NPT REDUCTION
- January 1, 2020
- By admin_aqa
- Comments 0
x
Metallurgical Analysis at DNV Singapore
- QA/QC FOR NPT REDUCTION
- January 1, 2020
- By admin_aqa
- Comments 0
x
Metallurgical Analysis at DNV Singapore
- QA/QC FOR NPT REDUCTION
- January 1, 2020
- By admin_aqa
- Comments 0
x
Metallurgical Analysis at DNV Singapore









